Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/1/434
Title: MACHINE CRAFTS: THE ASSIGNMENT PROBLEM
Authors: Khan J H
Hafeez A
Keywords: Machinery & Equipment
Publisher: NO
Abstract: The Assistant Production Manager of MC had to devise a scheduling plan which would minimize the total cost incurred in the production of four different machine parts. There were five machines available on which each of these parts could be made. The whole order for each part had to be manufactured on one machine only and could not be distributed among different machines because of the high set-up costs involved.
URI: http://hdl.handle.net/123456789/175633
http://localhost:8080/xmlui/handle/1/434
Appears in Collections:Business Case Studies

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.