Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/1/238
Full metadata record
DC FieldValueLanguage
dc.contributor.authorLaique A,en_US
dc.contributor.authorRana A Ien_US
dc.date.accessioned2017-01-30T08:15:58Z-
dc.date.available2017-01-30T08:15:58Z-
dc.identifier.urihttp://hdl.handle.net/123456789/175256-
dc.identifier.urihttp://localhost:8080/xmlui/handle/1/238-
dc.description.abstractThe case is about a small scale television producer in Pakistan. The business was setup eight years ago, and is in the process of expanding. Mr Asghar Laique, the technical director, is faced with the decision of how to increase capacity of the assembly line, maximize productivity. The basic issues pertain to balancing an assembly line, and the effects of workstation and process design on line productivity.en_US
dc.publisherYESen_US
dc.subjectElectronics-
dc.subject.classificationProduction,Operationsen_US
dc.subject.otherProcess analysis, assembly line balancing, work-station designen_US
dc.titleDYNASEL (PVT) LTDen_US
dc.type03-805-2000-1en_US
dc.locationCase Research Centreen_US
Appears in Collections:Business Case Studies

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.