Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/1/219
Full metadata record
DC FieldValueLanguage
dc.contributor.authorErskine Jen_US
dc.contributor.authorRana A Ien_US
dc.date.accessioned2017-01-30T08:15:58Z-
dc.date.available2017-01-30T08:15:58Z-
dc.identifier.urihttp://hdl.handle.net/123456789/175238-
dc.identifier.urihttp://localhost:8080/xmlui/handle/1/219-
dc.description.abstractThe case deals with a light engineering manufacturing concern that was in the process of being streamlined. The company had become bankrupt some years back and was acquisitioned by a major engineering concern. It lacked established systems and procedures, and so Ijaz Ali, a close associate of the Managing Director was sent in as a troubleshooter. One of the immediate problems was a very high Finished Goods Inventory. The issues to be tackled included inventory control, production planning (scheduling), and materials requirement planning.en_US
dc.publisherYESen_US
dc.subjectBicycles & Motorcycles-
dc.subject.classificationProduction,Operationsen_US
dc.subject.otherBicycles & motorcycles, process flow, production planning, inventory managementen_US
dc.titleLEADER CYCLESen_US
dc.type03-344-90-1en_US
dc.locationCase Research Centreen_US
Appears in Collections:Business Case Studies

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.