Please use this identifier to cite or link to this item:
http://localhost:8080/xmlui/handle/1/140| Title: | C-V-P AT ZULSHAM ENGINEERING |
| Authors: | Khan W M |
| Keywords: | Manufacturing and Textile |
| Publisher: | YES |
| Abstract: | Amer Saleem Qureshi, a young MBA and an Executive Assistant, prepared a C-V-P analysis for his family- owned engineering concern, Zulsham. The firm manufactured rings and spindles for the textile sector and faced competition from foreign manufactured products. Amer was concerned that if the firm kept on the way it had for the past two years; there might not be too many years ahead for it. Prior to performing any number-based analysis, he had to decide which costs were variable and which were fixed. The case addresses the issue of C-V- P analysis and also provides some information on the various duties and surcharges that exist in Pakistan. |
| URI: | http://hdl.handle.net/123456789/175119 http://localhost:8080/xmlui/handle/1/140 |
| Appears in Collections: | Business Case Studies |
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.